Construction of solar power plants
DEVELOPMENT AND PREPARATION OF NEW INVESTMENT PROJECTS
— Comprehensive energy audit of facilities (feasibility study into the construction of SPPs in the areas of interest)
DESIGN OF SPPs
— Development and approval of feasibility study and technical specifications for connecting to Oblenergo (regional power distribution network)
— Development and approval of SPP’s detailed design, design specification and ASCAPC project, project for connecting SPP to Oblenergo
SPP CONSTRUCTION AND INSTALLATION WORK
— Preparation of foundations for photovoltaic mounting systems
— — Surface and subsurface cabling and installation of necessary protective equipment
COMMISSIONING
— Testing of equipment and cable lines
— Setup of protective equipment and accessories
— Pilot operation
LEGAL SUPPORT OF SPP ON GREEN TARIFF
— Obtaining approvals for SPP
— Obtaining a license and "green tariff" from Ukraine’s National Commission for State Regulation of Energy and Public Utilities
— Becoming a member of the wholesale power market
— Signing a sale and purchase agreement with State Enterprise “Energorynok”
AFTER-SALES SUPPORT
— SPP monitoring
— Designer’s and customer supervision
Green tariff
A green tariff is an economic mechanism whose principal aim is to stimulate generation of electrical power by means of renewable energy, as well as to secure investment in this area. A program has been legally approved to provide long-term purchase at special premium tariffs of the electrical power generated.
Private households
SELECTING EQUIPMENT
Selection and ordering of necessary equipment
INSTALLING EQUIPMENT
Installation and commissioning of the power plant
SUBMITTING DOCUMENTS
Submission of an application and a package of documents to Oblenergo
OPENING A BANK ACCOUNT
Opening of an account with any bank for receiving funds from the sale of electrical power at a "green" tariff
INSTALLING A METER
Installation of a bidirectional energy meter
SIGNING A SALE AND PURCHASE AGREEMENT
Conclusion of a sale and purchase agreement with Oblenergo
DISTRIBUTING ELECTRICAL POWER
Sale of electrical power at a "green" tariff through monthly crediting of funds to a current bank account
Industrial power plants
LAND LEASE
Registration of a legal entity
FEASIBILITY STUDY
Approval of technical specification for connecting to the 10-230 kW power grid
DESIGN
Development of design documentation for power connection
PURCHASING EQUIPMENT
Customs clearance and equipment delivery
INSTALLING A POWER PLANT
Commissioning, pilot operation and power connection
LICENSE
Obtaining a license from the power producer and membership in the wholesale power market
SELLING AT A “GREEN” TARIFF
Conclusion of a power sale agreement
Legal framework
- Law of Ukraine “On Electric Power Industry“
- Resolution “On Establishing Fixed Minimum “Green” Tariffs for Electricity Generated by Private Households“
- Resolution “On Amending the Procedure for the Sale, Accounting and Settlement of Electricity Produced from Solar Radiation Energy by Electricity Generation Facilities (Power Generation Units) of Private Households“
- Law of Ukraine “On Alternative Energy Sources“
- Law of Ukraine “On Fundamentals of Operation of Electricity Market of Ukraine“
- Law of Ukraine “On Energy Saving“