Our projects

Geography of completed projects.

 

We carried out design and construction-installation works for Private Joint-Stock Company “Malyn Paper Mill-Weidmann”

✅ Installation of a cogeneration unit (CGU) based on two SIEMENS-G-86EM generators
✅ Installation of 6 kV and 0.4 kV switchgear units
✅ Laying of 6 kV and 0.4 kV cable lines
✅ Installation of power transformers
✅ Implementation of a starting current limitation system

Design and cost estimate documentation has been developed

“Reconstruction of the boiler house power supply system with the installation of a connection point for the Flexi 260 cogeneration unit at 11a Karadzhycha Street, Lviv”

Comprehensive Power Supply for a Hotel in Lviv

Our company developed a working project for LLC “Real Estate Development Center”, according to which the external power supply was implemented for a hotel with administrative and commercial premises, an underground parking lot, and a rooftop boiler house at 9 Mitskevych Square, Lviv.

The project for PARUS CITY

The scope of the working project includes the external power supply for the complex, which consists of five multi-apartment residential buildings with integrated public-purpose premises and three standalone parking lots (car parks).

Construction of a Shopping Center on Sheptytsky Street 2, Rudno

We completed the full range of electrical installation works to power the shopping center

Mechanical-Biological Complex for Waste Transfer and Processing in Lviv

✅ Relocated power grids from the construction site area
✅ Completed electrical installation works to power construction machinery
✅ Developed an external power supply project
✅ Carried out the reconstruction of PS-110/35/10 kV “Lviv-19” to connect the plant

Repair and maintenance of microprocessor-based relay protection and automation devices
at PS 330 kV “Hrabiv”, PS 400 kV “Mukachevo” and PS 750 kV “Western Ukrainian”

Relocation of 110 kV overhead power lines (LEP-110 kV “L-2 – L-9” with a branch to PS L-11 k.A.)
including replacement of the cable section between poles No. 13 – No. 14 (Lviv, Lypynskoho Street

✅ Dismantling and installation of a 110 kV pole
✅ Installation of a 110 kV cable line
✅ Installation of cable joints and surge arresters (OPNs)

Reconstruction of SS-110/10kV “KURORTNA” (Khmelnyk, Vinnytsia region)
✅Replacement of 110kV switchgear equipment
✅Installation of a sectional busbar system
✅Relay protection
✅Implementation of an automated substation telemechanization control system
✅Communication systems and security/fire alarm systems
✅Commissioning works

Execution of works for the relocation of 35kV overhead power lines PL-35kV L-4 – L-6 with the installation of a cable section (Pasichna Street, Lviv).

Construction and installation works for the replacement of the 110 kV overhead line TEC-1 – 110 kV substation Lviv-3 between poles No. 28–29 with a 110 kV cable line (Lviv, Kozlanyuka Street)

A set of works for external power supply of the secondary school of grades I-II (village of Verkhnya Rozhanka, Skole District, Lviv Region)

Reconstruction of 110/35/10 kV substation “Dunaivtsi” (Khmelnytskyi)

✅ Replacement of 110 kV oil-filled circuit breakers with SF6 (gas-insulated) breakers. Replacement of 110 kV current and voltage transformers;
✅ Replacement of 35 kV oil-filled circuit breakers with vacuum breakers. Replacement of 35 kV current and voltage transformers;
✅ Replacement of electromechanical relay protection systems with microprocessor-based protection systems.

Reconstruction of the 110/10 kV substation “ZLMK” (Kamianets-Podilskyi)

✅ Installation of 110 kV SF6 circuit breakers;
✅ Installation of 110 kV voltage and current transformers;
✅ Replacement of relay protection systems with microprocessor-based systems.

Reconstruction of 150/35/10 kV “Beryslavska” Substation (Kherson region)

✅ replacement of 35/10 kV transformer
✅ construction of equipment portals and foundations
✅ installation of 35 kV circuit breakers, disconnectors, current and voltage transformers
✅ installation of 10 kV switchgear
✅ commissioning and start-up works

Reconstruction of 35/10 kV “Vysokivska” Substation (Kherson region)

✅ replacement of 35/10 kV transformer
✅ construction of equipment portals and foundations
✅ installation of 35 kV circuit breakers, disconnectors, current and voltage transformers
✅ installation of 10 kV switchgear
✅ commissioning and start-up works

Relocation of the communication line cable route of the South-Western Power System (Bar, Vinnytsia region)

Construction and installation of two 35 kV cable lines and installation of an additional 35 kV line disconnector (Velyka Dobron village, Uzhhorod district, Zakarpattia region)

Reconstruction of 35 kV “Karyer Kupyno” Overhead Line (Khmelnytskyi region)

✅ clearing of the right-of-way
✅ re-equipment of the 10 kV overhead line
✅ dismantling of the 35 kV line on 10 kV poles
✅ construction of access roads

Construction of a 35 kV open switchgear (Hadz Farming Enterprise, Trybukhivtsi village, Ternopil region)

Technical upgrade of 110/35/10 kV “Balky” Substation (Bar, Vinnytsia region)

Reconstruction of 110/10 kV “Termoplastavtomat” Substation

Construction of a 110 kV overhead line from the 110 kV “Myronivka–Dashukivka” and “Myronivka–Yurkivka” lines (Bohuslav city)

✅ dismantling of the 110 kV substation and construction of a single-circuit 110 kV overhead line
✅ creation of a branch from the existing 110 kV “Myronivka–Dashukivka” line
✅ grounding and protection of the line from lightning surges

Construction and installation works for laying fiber-optic communication lines (Velika Dobron village, Uzhhorod district, Zakarpattia region)

Construction of a connection system for a complex for processing organic waste and silage into biogas for electricity and heat generation, located in Khmelnytskyi region, Teofipol district, Novostavetska village council, outside the village of Korov’ye, to the 110 kV grid of Khmelnytskoblenergo JSC

Construction of a rooftop and ground-mounted solar power plant with a total capacity of 1.44 MW (Boryslav, Lviv region)

New construction of a 150 kV transmission line from “HNS-SZS” Substation to the photovoltaic power station of LLC “ENERGY CENTER”, located in the territory of Vasylykivska village council, Kakhovka district, Kherson region

Capital repair of Danylo Apostol Street in the “Sygnivka” industrial zone (Lviv city)

Construction of a 30 kW solar power plant (Zalistsi village, Ternopil region)

Construction of a 30 kW solar power plant (Lypnyky village, Pustomyty district, Lviv region)

Reconstruction of street lighting

(Dvirtseva Square, Lviv)

Reconstruction of 220 kV “Lviv-2” Substation with installation of a 6 kV line bay

(Kukurudziana Street, Lviv)

Reconstruction of 110/6 kV “Brailkу” Substation

(Poltava city)

Construction of a double-circuit 110 kV transmission line from the 750 kV “Vinnytska” Substation to the 110 kV “Skhidna” Substation

(Vinnytsia region)

Reconstruction of 110/6/6 kV Substation No. 245 “Lviv-5”

(Lviv city)

Construction of 6 kV Cable Line from the 6 kV Distribution Point of PJSC “Poltava Oil Extraction Plant – Kernel Group” to the 6 kV Distribution Point of 110/6 kV Substation “Brailky”

(Poltava city)

Reconstruction of 110 kV Substation “Rayhorodska”

(Luhansk Region)

Reconstruction of 110 kV Transformer Substation “Verkhnoteplivska”

(Luhansk Region)

Electrical installation works of internal 0.4 kV networks; 5000 A (PJSC “POEZ-KERNEL GROUP”, Poltava)

✅Power works;
✅Power supply for auxiliary systems;
✅Lighting.

Reconstruction of the 110 kV “Azboshiferna” transformer substation

(Ivano-Frankivsk)

Electrical installation works of internal 0.4 kV networks; 5000 A (Kyiv)

✅Power works;
✅Power supply for auxiliary systems;
✅Lighting.