![](http://coverenergyplus.com.ua/wp-content/uploads/2019/01/1.jpg)
Construction and installation work for the replacement of the 110 kV overhead line of CHPP-1-SS 110 kV Lviv-3 between poles No. 28 and No. 29 with a 110 kV cable line (Lviv, Kozlanyuk Str.)
![](http://coverenergyplus.com.ua/wp-content/uploads/2019/01/2.jpg)
Project for external power supply of Secondary School I-II (Verkhnya Rozhanka, Skolivsky District, Lviv Region)
![](http://coverenergyplus.com.ua/wp-content/uploads/2019/02/P70902-102731-min.jpg)
Reconstruction of the 110/35/10 kV substation “Dunayivtsi” (Khmelnytskyi)
– Replacement of 110 kV oil circuit breakers with SF6 circuit breakers. Replacement of 110 kV current and voltage transformers;
– Replacement of 35 kV oil circuit breakers with vacuum circuit breakers. Replacement of 35 kV current and voltage transformers;
– Replacement of relay protection with microprocessor-based safeguards.
![](http://coverenergyplus.com.ua/wp-content/uploads/2019/02/P70902-102538-min.jpg)
Reconstruction of the 110/10 kV substation “ZLMK” (Kamianets-Podilskyi)
– Installation of 110 kV SF6 circuit breakers;
– Installation of 110 kV current and voltage transformers;
– Replacement of relay protection with microprocessor-based safeguards.
![](http://coverenergyplus.com.ua/wp-content/uploads/2019/01/3.jpg)
Project for the relocation of the cable line of Pivdenno-Zakhidna Power System (Bar, Vinnytsia Region)
![](http://coverenergyplus.com.ua/wp-content/uploads/2019/01/4.jpg)
Construction and installation work for the installation of two 35 kV cable lines and the backup 35 kV feeder disconnector (Velyka Dobron village, Uzhgorodsky District, Transcarpathian Region)
![](http://coverenergyplus.com.ua/wp-content/uploads/2019/02/IMG-3247.jpg)
Reconstruction of the 35 kV overhead line “Karyer Kupyno” (Khmelnytskyi Region)
– Clearing;
– Reequipment of the 10 kV overhead line;
– Dismantling of the 35 kV overhead line on the poles of the 10 kV overhead line;
– Organization of access roads.
![](http://coverenergyplus.com.ua/wp-content/uploads/2019/02/IMG-3249-1.jpg)
Construction of the 35 kV open switchgear (agroindustrial company “GADZ”, Trybukhivtsi village, Ternopil Region)
![](http://coverenergyplus.com.ua/wp-content/uploads/2019/01/5.jpg)
Construction and installation work for the laying of FOCL fiber optic networks (Velyka Dobron village, Uzhgorodsky District, Transcarpathian Region)
![](http://coverenergyplus.com.ua/wp-content/uploads/2019/02/image-0-02-04-de9d66128d12076cd8ac6fc1d592ef5e9cfc300bc50ce80dfa72cf19f2265bf1-V.jpg)
Construction of the 1.44 MW solar power plant (Boryslav, Lviv Region)
![](http://coverenergyplus.com.ua/wp-content/uploads/2019/01/7.jpg)
Construction of the 30 kW solar power plant (Zalistsi village, Ternopil Region)
![](http://coverenergyplus.com.ua/wp-content/uploads/2019/01/6.jpg)
Construction of Lypnyky Solar Power Plant (Pustomytivskyi District, Lviv Region)
![](http://coverenergyplus.com.ua/wp-content/uploads/2021/09/37663886-d613-4607-9a6b-2e8d1973d073-—-копия-e1592398215777.jpg)
New construction of the 150 kV transmission line (Kherson Region)
![](http://coverenergyplus.com.ua/wp-content/uploads/2021/09/Danyla-Apostola-e1594301904591.jpg)
Street overhaul in the industrial zone “Sygnivka” (Lviv)
![](http://coverenergyplus.com.ua/wp-content/uploads/2021/09/zaliznychnyy-vokzal.jpg)
Reconstruction of the street lighting (Lviv, Palace Square)
![](http://coverenergyplus.com.ua/wp-content/uploads/2021/09/20200527_112423-e1597404195273.jpg)
Reconstruction of 220kV substation with instalation of 6kV liner cell (Lviv)
![](http://coverenergyplus.com.ua/wp-content/uploads/2021/09/9-e1625217139137.jpg)
Reconstruction of 110/6kV subsration “Brailky” (Vinnytsya region)
![](http://coverenergyplus.com.ua/wp-content/uploads/2021/09/5-e1631015603669.jpg)
Reconstruction of 110/6/6kV substation “Lviv-5” (Lviv)
![](http://coverenergyplus.com.ua/wp-content/uploads/2021/09/3.jpg)
Сonstruction of 6kV cable line from 6 kV hydraulic fracturing plant to 6 kV switchgear 110/6 kV substation “Brailki”
![](http://coverenergyplus.com.ua/wp-content/uploads/2021/09/8.png)
Construction of a 110 kV two-circuit line from the 750 kV Vinnytska substation to the 110 kV Vostok substation.